Vacancies

REQUEST FOR EXPRESSIONS OF INTEREST

Star InactiveStar InactiveStar InactiveStar InactiveStar Inactive
 

REQUEST FOR EXPRESSIONS OF INTEREST
Grant No. and Title: 0652/0653-KIR: SOUTH TARAWA WATER SUPPLY PROJECT

Assignment Title: PROJECT ACCOUNTANT (NATIONAL)
Reference No: STWSP/CSI-3

The South Tarawa Water Supply Project (STWSP) has an estimated total budget of approximately US$58 million and will be co-financed by the Green Climate Fund (GCF), the Asian Development Bank (ADB), the World Bank (WB) and Government of Kiribati (GoK). The main objective of the project is to provide all households in South Tarawa with access to a reliable, safe and climate resilient water supply.

The Government of Kiribati's Implementing Agency (IA) for STWSP is the Ministry of Infrastructure and Sustainable Energy (MISE). MISE’s Project Management Unit (PMU) will be the core unit responsible for the overall implementation of the STWSP.

MISE's PMU is seeking a qualified individual consultant for the PMU Project Accountant (National). The initial term of this consulting services assignment is 12 months, with the possibility to extend subject to satisfactory performance. The implementation phase of the STWSP is expected to take around 5 years.

Terms of Reference The scope of work and the Terms of Reference is available at: www.mise.gov.ki or please click here

Minimum Qualification Requirements
Details of minimum qualification and eligibility requirements are listed in Terms of Reference.

The attention of interested consultants (including those referred by firms) is drawn to the ADB's Project Administration Instructions No. 2.01 (PAI No.2.01) especially Clause E (Conflict of Interest) and Clause M (Eligibility). In general, current employees of the Ministry of Finance and Economic Development (the Executing Agency), Ministry of Infrastructure and Sustainable Energy (the Implementing Agency) and Public Utilities Board (PUB) are ineligible to apply.

How To Apply: Applications should include:

  1.  Signed letter of application (maximum 3 no. A4 pages) addressing all minimum qualification requirements and summarizing experience relevant to the Project Accountant role as set out in the ToR.
  2. Curriculum Vitae (CV) - standard ADB format preferred.
  3. Signed declaration that the applicant is not a current employee of the Ministry of Finance and Economic Development, Ministry of Infrastructure and Sustainable Energy or the Public Utilities Board.

 

There are two options for submitting applications for this role:

  1.  ADB's Consultant Management System (CMS) To submit an application via ADB's CMS, applicants will first need to register using the following link: https://selfservice.adb.org/OA_HTML/adb/adbpos/jsp/ADBCMSHomepage.jsp
    If you have any difficulty with registering via CMS, this page also includes links to tutorials  (https://www.adb.org/documents/using-consultant-management-system-cms-quick-reference-guides-individuals-firms) or you can seek help via email This email address is being protected from spambots. You need JavaScript enabled to view it.
  2. Hardcopy or email application to this address:
    Dr Farran Redfern
    Secretary
    Ministry of Infrastructure and Sustainable Energy
    Betio, Tarawa, Kiribati Tel: +686 75126192
    E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Applications close at 4:00pm on 20th May 2021.

Please direct any inquiries to:
Mr Joshua Chappelow
Project Manager, STWSP Ministry of Infrastructure and Sustainable Energy
Betio, Tarawa, Kiribati
Tel: +686 7304 8301
E-mail: This email address is being protected from spambots. You need JavaScript enabled to view it..k 

Newsletter subscription

Search